A rating curve for a spillway that changed shape.

A new level-to-flow relationship for a spillway after stoplogs, the sensor and the datum all changed, implemented and checked against reference tables.

Photo placeholder (P14): Field photo: dam spillway with stoplogs and the level sensor mount.

Results

  • 2

    segment model (linear + quadratic)

  • ≈0.7 m³/s

    mean absolute error vs reference

  • 0–10 m³/s

    range of the comparison

A spillway had changed physically — stoplogs, sensor position and datum — and the existing level-to-flow curve no longer described it. Flow figures at low discharge mattered most, and the historical level record needed to be brought onto the corrected datum.

Approach

  • Studied the hydraulic regimes involved (channel, transition and weir) and the requirements of continuity and monotonicity.
  • Moved from an initial three-regime concept to a calibrated two-segment model, linear then quadratic, with a threshold near 287.67 mRL and the sensor near 285.19 mRL.
  • Corrected the historical datum and documented the assumptions about the stoplogs.

Result

Compared with the reference table, the mean absolute error was close to 0.7 m³/s over the 0–10 m³/s range. That figure depends on the comparison set and range; it is a check, not a regulatory validation. Flow and elevation views in the platform let operators see both side by side.

Gallery

  • Photo placeholder (P15): Chart: two-segment rating curve plotted against the reference table.
    Two segments, continuous at the threshold, checked against the reference table.